Jun. 2024 – ANABEEB in SIWW2024

Location: ARKAN, ANABEEB booth in Singapore Water Week

Participation of ANABEEB in SIWW 2024 from June 19th to 21st in the Sands Expo and Exhibition Center. ANABEEB is now part of Emirates Steel Group.


Apr. 2022 – ANABEEB in SIWW2022

Location: ARKAN, ANABEEB booth in Singapore Water Week

Participation of ANABEEB in SIWW 2022 from April 18th to 21st in the Sands Expo and Exhibition Center.


Dec. 2021 – ANABEEB Relining pipes sent to Hong Kong

Location: factory located in the city of Abu Dhabi

Short 1m relining pipes with flush couplings were sent to Hong Kong for existing concrete sewer pipes rehabilitation works.


Nov. 2021 – ELIOT in Maintenance & Resilience Tokyo 2021 exhibition

Location: city of Tokyo

ELIOT RFID tags and detectors were shown on Keihai’s booth during this exhibition.


Nov. 2019 – Delivery of P3 valves in France

Location: city of La Ferté-sous-Jouarre

Under pressure installation of 3D valves on service pipeline is getting popular in France. Service pressure up to 10 bars, diameters ranging from 75mm up to 600mm.


Jul. 2019 – Mega Solar Power Plant in Ako

Location: city of Kamigori, Hyogo Prefecture

Mission as project manager in the construction project of a mega solar power plant in Hyogo Prefecture. 102MWp capacity, more than 250,000 modules installed on time. This plant is in operation since January 2021.


Feb. 2019 – 500mm P3 VALVE in FRANCE

Location: city of CESSON near MELUN, on February 8th 2019

For the first time in Europe a 500mm diameter P3 stopper valve from COSMO KOKI was installed on a pressurized (4 bars) sewerage ductile iron pumping main without interruption of operation. The equipment was supplied by EIE (Equipement Industriel Européen) and installation was successfully carried out by SETHA.


Nov. 2018 – POLLUTEC 2018

Location: Lyon from November 27th to 30th,

Major European and International show with all environmental companies. Participation on EIE booth (www.eie.fr) with Cosmokoki to present the latest generation of stopper valve.


Mar. 2018 – JEC 2018

Location: Paris, France

International exhibition for major composite material suppliers like Ashland, Owens Corning. In Villepinte during March 6-7-8, great show!


Nov. 2017 – BESSAC

Location: Osaka, Japan

Visit of micro-tunneling projects in Japan. Sharp curves and Japanese equipments.


Sep. 2015 – Sep. 2016 – JICA

Location: Maghreb, Algeria, Tunisia, Morocco,

Identification of potential infrastructure projects to be financed by JICA.


Jan. – Oct. 2016 – JICA

Location: India, Chennai,

Preliminary investigations for the construction of a desalination plant in Chennai.


Nov. 2015 – WABAG VA TECH

Location: Philippines, Manila,

Site supervision and unloading of containers with GRP pipes and fittings. Delivery of 53 40’ containers in Ilugin STP site area with support of unloading and checking of material.

Anabeeb IMG_1031
Ilugin Sewerage Treatment Plant in Manila

Jun. 2015 – UTAH University

Location: USA, Salt Lake City

Interview of Dr. Steven Folkman, specialist in buried structures and rehabilitation of pipelines and Dr. Reynold King Watkins, Author of Structural Mechanics of Buried Pipes.


Apr. 2015 – GDF Suez

Location: Japan, Osaka, Nagoya, Tokyo

Study of anti-seismic measures applied to gas pipeline network in Japan. Visit of major gas companies (Osaka, Nagoya, Tokyo), Three Dimensional Full-Scale Earthquake Testing Facility near Kobe.


Nov. 2014 – GDF Suez CRIGEN

Location: Japan, Tokyo, Osaka, Kyoto

Promotion of an innovative buried pipelines locating system using RFID technology. The only technology that gives 10cm locating accuracy under any subsoil conditions. GrDF and ErDF in France started to use the product and it is quickly spreading all over the world


Oct. 2009 – Mar. 2010 – JICA

Location: Cabo Verde, Santiago Island

Preliminary hydraulic design for the supply and distribution of potable water system.


2008 – Aug. 2010 – THALES

Location: UAE, Dubai

Installation and commissioning of automated fare collection equipments in 49 stations. Equipments are composed of gates, tickets vending machines, central processing system installed in Data Center.


2009 – JICA

Location: Cabo Verde, Santiago Island

 Identification of project for the supply of Santiago Island by desalination of sea water. Definition and identification of project to be financed by JICA


2008 – JICA

Location: Morocco,

Development of water resources in Southern Morocco. Site investigation for the elaboration of a water distribution project to be financed by JBIC.


2007 – KAJIMA

Location: Algeria,

Construction of a 400km highway (East lot). Coordination and preparation of technical memorandum for tender documents. The project is 4 billion USD offer.