Big on going projects:
In Ho Chi Minh City
- 2400mm pipeline, as Design-Build 10km potable water transfer project to supply the centre of Ho Chi Minh City. (contractor VINCI, financed by Asian Development Bank, 69MUSD). The pipeline route runs along metro Line 1, currently under construction, and under the Saigon River.
- 3500mm pipe 8km long interceptor will convey 480,000m3/day to the largest Wastewater Treatment plant in Vietnam. This project will allow to improve the water quality of the Saigon River (contractor: Italian – Thai Development Public Company Ltd. project financed by World Bank, 495MUSD, Royal Haskoning DHV for the supervision. )
In Hanoi City
- Yen Xa Sewerage System Project in Thanh Tri District (financed by Japanese International Cooperation Agency, 800MUSD) consists in a Waste Water Treatment Plant with a capacity to treat 270,000m3 of wastewater per day with a collection system with a total length of approximately 52 km of sewers.
大型案件進行中
ホーチミン市
- 口径2400mm、延長10kmの水道管はホーチミン中心部を供給する。設計施工タイプの契約で、建設会社はフランスのヴィンチ社が2017年に受注。アジア開発銀行がファイナンス、6千9万ドル。管のルートは現在工事中の地下鉄1号線沿いで、サイゴン川下を通過する予定。
- 口径3500mm、延長8kmの下水道管はベトナムで最大規模の下水処理場(処理能力日量48万トン)に繋がる。このプロジェクトはサイゴン川の水質を改善する。施工会社はイタルタイ社、ファイナンスは世界銀行、4.95億ドル、施工管理はローヤルハスコニング社。
ハノイ市
- エンサ下水整備事業はJICAの円借款で8億ドル規模のプロジェクト、日量27万トンの下水処理場と総延長52kmの下水網を建設予定。